    MINIMUM PLAN REQUIREMENTS FOR SUBDIVISION SITE PLANS

    E.E.F.S. JOB NO.: DATE:

    REVIEW NO.:

    The information within this checklist is a minimum for obtaining approval. The plans must contain the following sheets, with the information as stated, in order to be reviewed. Submit plans with appropriate fees, applications, permits, drainage info, and non-adverse effects letter.

    ____________ All sheets stamped with signature from authority of record

    TITLE SHEET

    ____________ Project name and street address

    ____________ Owner/developer name, address, phone number (including cell and fax)

    ____________ Vicinity map with location to ¼/¼, section, township, range

    ____________ Engineer's name, address, phone number (including cell and fax)

    ____________ Plans on 24" × 36" sheets only

    BOUNDARY SURVEY/EXISTING CONDITIONS

    ____________ Topographic tie to USGS Datum — note tie location

    ____________ Existing public roads with right-of-way width and paving width

    ____________ Utilities — water, sewer, electric power, phone, natural gas, other

    ____________ Easements

    ____________ Zoning classification and zoning of all adjacent property

    ____________ Fire hydrant nearest to proposed development with color of top noted on drawing

    ____________ Drainage structures (size and type)

    ____________ Property boundary with marker and boundary tie

    ____________ Legal description and deed reference

    ____________ Parcel identification number

    PROPOSED SITE PLAN

    ____________ Proposed use

    ____________ Property boundary

    ____________ Building location (existing and proposed)

    ____________ Setback requirements

    ____________ All adjacent buildings within 50 feet of boundary and use

    ____________ Street names, alleys and private roads

    ____________ Easements

    ____________ Sight distance to public access

    ____________ Driveways with width and location

    ____________ Buffer zones

    ____________ Variances (supply copy if previously approved)

    ____________ Minimum lot size/dimensions

    ____________ Fire hydrant minimum spacing

    GRADING AND DRAINAGE PLAN

    ____________ Topography tied to USGS

    ____________ Existing and proposed contours

    ____________ Existing and proposed drainage structures - pipes (headwater - hydraulic grade lines — Q(CFS) — V(FPS))

    ____________ Design data used (25 Year)

    ____________ Headwater on all entry pipes

    ____________ Inlet D.A., CFS (Maximum 600' Spacing)

    ____________ Drainage profiles as necessary

    ____________ Floodprone areas (firm number and panel)

    ____________ Drainage channels - channel lining type — flow level velocity

    ____________ Outlet velocities greater than 5fps require energy dissipation

    ____________ Drainage report

    ____________ Non-adverse effects letters

    ____________ Max grades 3:1 (or written statement from geotech engineer assuring slope stability)

    ROADS AND STREETS PLAN AND PROFILES

    ____________ Name and location of existing and proposed streets

    ____________ Minimum ROW width 50' (50' radius at cul-de-sacs)

    ____________ Plan and profiles on all proposed streets

    ____________ Typical roadway sections including curb and gutter (C/G 2' V/G 2.5')

    ____________ Typical road buildup (1½" binder 1" seal 8" base)

    ____________ Complete horizontal and vertical curve data

    ____________ Intersections separation not less than 150'

    ____________ Cul-de-sac (or temporary turnabout at dead ends) minimum paving radius 40'

    ____________ Maximum grades not exceeded, including 50' of 3.0% at intersections

    ____________ Block length 400'-1600'

    ____________ Inlet maximum 600' spacing

    Notify engineer 24 hrs before any phase of operation is started

    EROSION CONTROL PLAN — AS SUBMITTED TO ADEM AND SWM

    ____________ Design to comply with Alabama Handbook of Erosion Control

    ____________ Copy of ADEM permit

    ____________ Copy of Jefferson County Stormwater Permit

    SANITARY SEWER OR ON-SITE SEWER DISPOSAL SYSTEM

    ____________ Approved plans from Jefferson County Environmental Services or Jefferson County Health Department

    ____________ Sanitary sewer impact number

    ACCESS PERMIT TO STATE OR COUNTY ROADS

    All plans (6 sets) must be prepared by a registered engineer, architect or appropriate professional in accordance with state law.

    The engineer must check and sign this form before plans will be accepted for review.

    I certify that the preceding information is complete and true to the best of my knowledge.

    ____________ ____________ / ____________ / ____________
     Engineer
    ____________ / ____________ / ____________ ____________
     Date

     

    The above information is complete enough to begin the plans review process.